We stand ready to help any customer in need. Our People First philosophy led us to suspend disconnects while our community bands together during this challenging time. If you are experiencing financial hardship, we urge you to contact us for help. Call us at (210) 353-2222 or online cpsenergy.com/assistance.

 
Highland Hills Substation Control House

Collective 7000158128

Description: CPS Energy is seeking a Company to construct a Control House on an existing slab foundation provided by CPS Energy at Highland Hills Substation.

Solicitation Detail:

CPS Energy is seeking a Company to supply all material required and assemble a 32’ x 44’ engineered metal building (i.e., “control house”) on an existing slab foundation provided by CPS Energy at Highland Hills Substation and associated services.       

Solicitation Documents:

Companies wishing to provide a Response for this Solicitation must download the Collective Document for this Solicitation no later than April 8, 2020 from the website. There is a link for the Collective Document located on the left side of this page, under the “Solicitation Documents.” To successfully download the documents, it is recommended that Google Chrome 33+, Mozilla Firefox 38.01.1, or Internet Explorer 9 or greater be used.

Pre-Solicitation Meeting:

A Non-Mandatory Pre-Solicitation Meeting will be held remotely on March 18, 2020 at 10:00 AM (Central) via WebEx. Information for the WebEx meeting will be provided upon receipt of the Acknowledgement of Receipt document embedded in the Collective. This meeting is not mandatory; however, it is highly recommended that the interested companies attend.

Response Due Date:

Responses are due no later than April 9, 2020 at 2:00 PM (Central). CPS Energy reserves the right to reject late Submittals. The Collective Document contains all pertinent information regarding Responses.

Contact Name: Miranda Clary

Contact Email: mclary@cpsenergy.com