ALERT - CPS Energy crews will work through the evening to restore gas services to the Trinity Oaks Subdivision.  Once service is restored, we will go door to door to safely relight gas appliances and gas pilot lights. Please exercise caution and follow our gas safety tips.  Report gas emergencies immediately to 210-353-4357 (HELP).

Solicitation Documents

 
Battery Energy Storage System

Collective 7000154961

Description: Company to provide either a 75 kW/48kWh or 100 kW/100 kWh Battery Energy Storage System to be located within CPS Energy’s service territory at Joint Base San Antonio, Fort Sam Houston, Texas.

Solicitation Detail:

The Company shall engineer, design, procure, construct, install, test and commission a fully functional BESS (the “Services”) that will be owned and operated by CPS Energy, in accordance with Exhibit B, “Specifications.”  This includes supplying all the required equipment, materials, labor, and tools for the Project.

Solicitation Documents:

Companies wishing to provide a Response for this Solicitation must download the Collective Document for this Solicitation no later than August 25, 2019 from the website. There is a link for the Collective Document located on the left side of this page, under the “Solicitation Documents.” To successfully download the documents, it is recommended that Google Chrome 33+, Mozilla Firefox 38.01.1, or Internet Explorer 9 or greater be used.

Pre-Solicitation Meeting:

A Non-Mandatory Pre-Solicitation Meeting will be held on August 12, 2019 at 1:30 pm (Central) at CPS Energy EMC (Auditorium) 4514 Frank Bryant San Antonio, Texas 78219. This meeting is not mandatory, however, it is highly recommended that the interested Companies Attend.

Response Due Date:

Responses are due no later than August 26, 2019 at 2:00 p.m. (Central). CPS Energy reserves the right to reject late Submittals. The Collective Document contains all pertinent information regarding Responses.

Contact Name: Rosalinda Ramirez

Contact Email: mrramirez@cpsenergy.com