CPS Energy crews are mobilized and responding to power outages in our service area.  We will have crews working throughout the evening to safely restore power.  For the latest outage information visit our Outage Center.

Solicitation Documents

 
Air Preheater (APH) Inspections and Technical Support Services

Collective 7000154053

Description: Company shall provide all labor, tools, equipment and machinery, parts and materials necessary to perform air preheater (“APH”) inspections and technical support Services, on an as needed basis, and as requested by the CPS Energy Field Representative.

Solicitation Detail:

1.       Company shall provide all labor, tools, equipment and machinery, parts and materials necessary to perform air preheater (“APH”) inspections and technical support Services, on an as needed basis, and as requested by the CPS Energy Field Representative.  Services shall be pursuant to the Contractor Work Package which will vary in nature and may include, but not be limited to the following activities (“Services”):

a.       Inspections and maintenance:

b.      Perform field technical support.

c.       Site supervision.

d.      Startup and/or installation supervision.

e.       Provide baskets, seals, bearings, pin racks, sector plates, etc. and any new replacement parts which meet or exceed the original manufacturer and CPS Energy standards for the following:

f.        Provide a report of findings/recommendations;

g.       Company shall perform Services at one or more CPS Energy Power Generation locations set forth in Addendum G.

Solicitation Documents:

Companies wishing to provide a Response for this Solicitation must download the Collective Document for this Solicitation no later than June 28, 2019 from the website. There is a link for the Collective Document located on the left side of this page, under the “Solicitation Documents.” To successfully download the documents, it is recommended that Google Chrome 33+, Mozilla Firefox 38.01.1, or Internet Explorer 9 or greater be used.

Pre-Solicitation Meeting:

There will be no Pre-Solicitation Meeting.

Response Due Date:

Responses are due no later than June 28, 2019 at 2:00 p.m. (Central). CPS Energy reserves the right to reject late Submittals. The Collective Document contains all pertinent information regarding Responses.

Contact Name: Dolores Torres-Elizondo

Contact Email: dtelizondo@CPSEnergy.com